The Provencher Bridge will be completely closed to traffic starting at 6:00am on Saturday, May 28 and reopening at 10:00pm on Sunday, May 29.
The closure is for maintenance of expansion joint seals. Pedestrian can still use the north sidewalk. The Esplanade Riel will also remain open.
Motorists should use alternate routes such as the Louise Bridge or Norwood Bridge while maintenance is underway.