The Arlington Overpass over the Canadian Pacific Railway tracks will be closed to vehicular traffic beginning 6:00am on Monday, July 15, 2013.
The closure is due to City of Winnipeg repair work being performed on the bridge including the deck overlay, structural steel repairs and maintenance. The overpass will reopen at 6:00am on Saturday, August 31, 2013.
The east sidewalk will remain open during this period for pedestrian traffic.
Motorists are reminded to allow additional travel time and to use alternative routes in the area such as the McPhillips Street Underpass and the Slaw Rebchuk Bridge.