PHOTO: Arlington Bridge Reconstruction Concept Art

Construction on an Arlignton Bridge replacement could start by 2020. The current bridge is over 100 years old and needs to be retired.


The new bridge will cost more than $300 million and have three lanes as well as bike paths and sidewalks.

There are five possible concepts:

  • Steel Girder with Tied Arch Concept
  • Steel Girder Concept
  • Tied Arch Bridge Concept
  • Steel Truss Bridge Concept
  • Cable Stayed Bridge Concept

bridge-concept

For more information visit http://www.connectwinnipeg.ca/.